The CLI Pride was in the shipyard for the 2nd major class refit as well as the installation of BWTS (Ballas water treatment).
The CLI Pride was in the shipyard for the 2nd major class refit as well as the installation of BWTS (Ballas water treatment).
As part of a major overhaul and class renewal, a particularly heavyweight guest lay in the large dry dock for 2 weeks – the almost 170-meter-long and nearly 25-meter-wide bulk carrier „SANDNES“. The ship usually transports up to 27,000 tons of rock from a Norwegian quarry to a total of 48 different destination ports throughout
The Meteor, a multi-disciplinary research vessel, is deployed around the world in the fields of marine geology, oceanography, maritime biology, marine chemistry and ecology. During the period from mid to late February, seawater line modifications and routine repair work were performed at an EWD berth.
Photo from left: Dr. Bernhard Brons, Peter Detmers, Holger Stomberg (Works Council EWD), Günter Geerdes and Stephan Lomscher (Team Leader Training EWD). The Emder Werft und Dock GmbH was presented with the TOP Ausbildung Emder Werft und Dock GmbH certificate by the IHK President for East Frisia and Papenburg, Dr. Bernhard Brons, and the
Busy times- drydocking of large vessels at the beginning of the new year The container vessel “Elbsky” has seen drydocked on 4th January 2021 for an extensive class overhaul for 2 weeks. The RoRo Vessel “Eddystone” has been drydocked directly after for an emergency docking inspection of the shaft System. Beside that the cargo vessel
EWD received the order for 4 BWT Installations for the Ships BBC Maryland, BBC Plata, BBC Oregon, BBC Lisboa in October 2020. They were carried out within 8 weeks in parallel with drydocking and class renewal work. This extensive work effort has been carried out and the vessels than redelivered in time. The cruise vessels
The historical Lighthouse Ship „Amrumbank” has been delivered to the owner Museums-Feuerschiff Amrumbank/Deutsche Bucht e.V. after an extensive refit. The historical vessel arrived at yard on 6th January 2020 for an extensive conversion and reconstruction according to the original building status. An extensive reconstruction work has been carried out to the ships hull, machinery, accommodation
Abstract: Following the sale to BENLI group from Bremerhaven, Emder Werft und Dock (EWD) intends to further strengthen its market position. The focus will remain on the ship repair business for various customers such as the German navy, ship owners, federal agencies as well a cruise and offshore companies. „Flying squads“ can take care of
In order to underline the investment and strengthen the business even more, the new Owner BENLI GROUP implemented Mr. Bjoern Sommer as Managing Director with the background of profound contacts and experience from former careers with the main task for strengthening the repair project business in the future.
The Cruise Vessel „Amadea“ arrived on the 18. July 2020 for a wet docking alongside the yards quay period for overhaul and repair work in the engine and deckareas. Beside that the SWATH Type Navy Research Vessel „Planet“ left the shipyard after 15 month, extensive repairs, overhaul and modification of the drive system and auxilliary systems