We are pleased to announce that the RS Sentinel has chosen to stay in dry dock at Emden Dockyard.
The diving and survey vessel was equipped with new sonar equipment.
In the course of this, a calibration of the ship and the exchange of the seawater valves took place in our dry dock.
After two days, the RS Sentinel could leave the dry dock again and continue the work in the North Sea.