On 5 May we welcomed the container ship ELBFEEDER in Emden for the first time. During the 14-day dock period, the propulsion system was repaired. A ballast water system (BWTS) was installed as well as a sewage system. The underwater area was completely blasted, which was mostly done with blasting robots, the remaining areas were