After an extended deployment of the offshore support vessel SIEM BARRACUDA in the Asian region, a pit stop was made at EWD on the way back to NorwayIn the dock, the shaft devices on the drive units were replaced. Both bow thrusters were overhauled in our mechanical workshop after removal.
On 21.10.2022, the Siem Barracuda was able to continue her voyage to Norway on schedule.