The pilot station ship ELBE, which entered service in 2010, underwent the overdue 3rd class renewal.
In addition to repairing the outboard valves and paint work, extensive work was carried out on the shafts and steering gear.
All four stern tube bearings were spindled out and replaced and the stern tube seals were repaired.
The fin stabilization system was completely overhauled.