On 5 May we welcomed the container ship ELBFEEDER in Emden for the first time.
During the 14-day dock period, the propulsion system was repaired. A ballast water system (BWTS) was installed as well as a sewage system.
The underwater area was completely blasted, which was mostly done with blasting robots, the remaining areas were washed by hand with 2,500 bar maximum pressure. Last but not least, a silicone coating was applied.
On May 19, the Elbfeeder left us again with the destination Rotterdam.