The bulk carrier SANDNES left us on March 29 with new outfit. The following work was carried out on the ship, which visited us for the third time: overhauling of the bow and stern thrusters, overhaul of the generator, the anchor winch and the hydraulic cylinders of the discharging boom, overhauling of the shaft system.
Steel work was carried out in the tanks, the outer skin was coated and the main discharging belt was replaced.