After the bulk carriers SANDNES and BULKNES from HJH Shipmanagement we welcomed the sister ship BELTNES this month.
Two ballast water treatment systems also installed on the BELTNES – capacity 800 to/h including fabrication and installation of the housing for the BWTS on the main deck.
Fabrication and installation of DN 15 to DN 450 pipelines from the main deck to the engine room and back. The bow and stern thrusters and the hydraulic cylinder of the unloading arm were also overhauled.
Steel work was carried out in the tanks, the outer skin was coated and the main unloading belt was replaced. A class renewal also took place.