- EWD received the order for 4 BWT Installations for the Ships BBC Maryland, BBC Plata, BBC Oregon, BBC Lisboa in October 2020. They were carried out within 8 weeks in parallel with drydocking and class renewal work. This extensive work effort has been carried out and the vessels than redelivered in time.
- The cruise vessels „Amera“ and „Amadea“ are alongside and a number of repair work has been carried out here.
- Emergency docking between New Years Eve: The car carrier “Malacca Highway” has been emergency drydocked shortly before New Years eve removal of bow thruster and undocked within one day. The bowthruster overhaul is carried out and will be installed at a later Stage.